I just had a long conversation with the builder about the state of the renovations (he's a bit of a talker, but then so am I!) although I haven't been there today. He said the framing and plumbing inspections have been passed, and the guy doing the insulation was in there today (and will be tomorrow as well) and the inspection for that is scheduled for Monday. The drywall will go up after that -- originally (early last week) he had said the drywall would have been done late last week, so we've slipped by about a week. Once the drywall is in place, he figures there will be about seven 10-hour days worth of work to do all the painting and other finishing, so that sounds like two work weeks to me. I think he said the outside pavers were put down today (or will be done tomorrow?) and he's picking up the fence tomorrow, so that might get installed tomorrow as well.
When we were there yesterday we saw that the little seat between shower and tub has been framed, which led us to change our minds on where the lip of the shower should be. Originally we were going to have it go straight across, continuing the wall of the shower, but now we're going to angle it from the corner of the wall to the corner of the seat. The bathtub is in place, and the plumbing is all roughed in for the shower and tub. I imagine the toilet and sink are roughed in as well if the plumbing inspection has already been done, but I didn't notice that specifically.
The beam that goes through the middle of the skylight in the closet won't be able to be removed, but Brooke mentioned that we could put opaque glass at the level of the ceiling to just let the light through, and not actually see the beam.
Out of touch for a bit
15 years ago
1 comment:
Post a Comment