Joel was here pretty much all week painting inside. It's looking better, but I don't think he's done much around the wall/ceiling line, which is where it is most noticeably bad. I think it's improving, though.
We had a meeting with Sean on Tuesday and he said that everything should be done in, get this, six more weeks. But that's including the time it takes to order a new window for the bedroom. The building inspector decided that the window that opens at the top currently needs to open at the bottom, so a whole new window has to be ordered. It makes me mad because it was built exactly how it was shown on the plans that they approved -- why didn't they catch it then?
The blinds people called this week and our blinds have arrived and will be installed on Monday.